Scottish Power, Protection & Control Panels

Morson Praxis have been appointed by Scottish Power to deliver a wide range of Protection & Control Panel projects, supporting the ongoing reliability and performance of their UK-wide power networks.

Client Brief

Delivering Trusted Power Infrastructure Solutions

Scottish Power required a reliable, end-to-end partner to design, manufacture, test and deliver a suite of Protection & Control Panels to support the continued operation and expansion of their Energy Networks infrastructure.
Each panel needed to meet strict technical specifications, futureproofing their systems with robust build quality and adaptable layouts.

Project Overview

Precision Engineering from Design to Delivery

Under a series of ongoing contracts, Morson Praxis were responsible for the design, manufacture, testing and delivery-to-site of Protection & Control Panels, including the management of off-loading and installation readiness.
Each panel was completed to specification, incorporating small wiring, terminal boards, labels, fuses, links and ancillary equipment in full compliance with Scottish Power Energy Networks’ standards.

Image Gallery

Engineered precision powering the future of energy networks.

Our Solution

Built for Performance and Future Flexibility

The panels were designed with expandability in mind, allowing for future additions or removals within the network’s infrastructure.
To ensure seamless integration, bus wiring was carried through to adjacent panels using multi-core cables, maintaining continuity and ease of upgrade across the panel suite.
Every unit underwent rigorous in-house testing to guarantee operational reliability and compliance prior to delivery.

Results

Strengthening the Backbone of the Power Network

Morson Praxis successfully delivered high-quality, fully tested protection panels that enhance the safety, control and efficiency of Scottish Power’s infrastructure.
Our adaptable designs and precision manufacturing have supported long-term network resilience and reduced installation time on-site.