Projects →

Ocado, Distribution Centre

Morson Praxis was appointed to provide multi-disciplinary design services for a new state-of-the-art distribution centre.

Client Brief

Supporting the Growth of Automated Logistics

Ocado Group required specialist design and engineering expertise to support the development of its £210 million Customer Fulfilment Centre, creating a highly efficient facility capable of meeting growing customer demand.

Following the successful delivery of the initial structural design, Morson Praxis was further appointed to support the expansion of the dispatch area, ensuring the facility could continue to optimise automated operations and increase capacity.

Project Overview

Delivering a High-Performance Fulfilment Centre

Morson Praxis initially provided the structural design for Ocado’s Customer Fulfilment Centre before being appointed to deliver the architecture, civil engineering, and structural design for the extension of the dispatch area.

The completed facility incorporates highly sophisticated automation technology, enabling the distribution centre to fulfil up to 200,000 customer orders each week. The dispatch extension also accommodates two new in-situ scissor lift platforms, supporting the efficient movement of goods throughout the facility.

Image Gallery

Supporting one of the UK's most advanced automated distribution centres through multi-disciplinary design.

Our Solutions

Integrated Design for Automated Distribution

Morson Praxis delivered a coordinated package of architecture, civil engineering, and structural engineering services to support both the original facility and its subsequent expansion.

Working closely with Ocado Group, our team developed practical engineering solutions that integrated seamlessly with the site’s automated systems, ensuring the dispatch extension enhanced operational efficiency while supporting the long-term performance of the fulfilment centre.

Results

Increasing Capacity for Automated Order Fulfilment

The completed distribution centre provides Ocado Group with a highly efficient, automated facility capable of fulfilling up to 200,000 customer orders per week.

By supporting both the original development and the dispatch area extension, Morson Praxis helped deliver a flexible, future-ready logistics facility designed to accommodate continued operational growth.

To top